Old installation, sale or rental of a property, board without RCD: we bring your installation into line with the NF C 15-100 standard and support you through to the Consuel certificate.
A non-compliant installation is not always dangerous, but some points really are: no earth, no 30 mA RCD protection, fuse board, bathroom sockets outside the safe zones. We carry out a full diagnosis and give you a clear report distinguishing what is mandatory, what is recommended and what can wait.
We then price the work item by item: earthing, board replacement, circuit protection, equipotential bonding, safety in wet rooms. You choose the scope with full knowledge.
Get a quote
Check of the board, earthing, protections, circuits and wet rooms. Written report with priorities.
Replacement of fuse boards, addition of 30 mA RCDs, correct breaker rating per circuit.
Creation or repair of the earth electrode, equipotential bonding in bathroom and kitchen, resistance measurement.
File preparation, final check and issue of the compliance certificate required for any new connection.
We upgrade homes and premises across the Chablais, from Allinges to Evian-les-Bains via Thonon, Sciez, Bons-en-Chablais and Douvaine, as well as in Annemasse, Saint-Julien-en-Genevois, Cluses and Annecy. Co-ownerships and landlords managing several properties in Haute-Savoie regularly entrust us with grouped compliance work.
The diagnosis takes about an hour on site. The quote is sent within 48 hours.
An electrical diagnosis is mandatory for any sale or rental of a property whose installation is over fifteen years old. Work is not imposed on sale, but a landlord must provide a property whose installation presents no danger. We often step in after an unfavourable diagnosis.
Safety work corrects the six danger points set by regulation (earth, RCD, board, wet rooms, damaged conductors, obsolete equipment). Full compliance applies the whole NF C 15-100 standard, as for a new build. We advise the option suited to your budget and project.
For any new installation, any complete renovation and any new grid connection, including for an EV charger or solar production. We prepare and file the application for you.
A board replacement with earthing is done in one day. A full compliance upgrade of a home takes three days to two weeks depending on the floor area.
New house, flat to renovate or business premises: CHN.ELEC delivers your complete electrical installation, from the switchboard to the last socket, across the Chablais and all of Haute-Savoie.
No power, a breaker that keeps tripping, a burning smell at the board? We diagnose and repair on site, with common parts on board.
Control the shutters, schedule the heating, light only what is needed: we install simple, reliable solutions that cut your bills.
Charge your electric or hybrid car at home, safely, without tripping the meter. We assess your installation and fit the right solution.
Thermal comfort starts with a sound electrical installation. CHN.ELEC supports you in Allinges, Thonon-les-Bains and throughout the Chablais region.
Contact us for a free, no-obligation quote. Response within 24 hours.