Electrical compliance upgrades in Haute-Savoie

Electrical compliance upgrades in Haute-Savoie

Old installation, sale or rental of a property, board without RCD: we bring your installation into line with the NF C 15-100 standard and support you through to the Consuel certificate.

Making it safe without necessarily redoing everything

A non-compliant installation is not always dangerous, but some points really are: no earth, no 30 mA RCD protection, fuse board, bathroom sockets outside the safe zones. We carry out a full diagnosis and give you a clear report distinguishing what is mandatory, what is recommended and what can wait.

We then price the work item by item: earthing, board replacement, circuit protection, equipotential bonding, safety in wet rooms. You choose the scope with full knowledge.

Get a quote
Making it safe without necessarily redoing everything

Points checked and corrected

Full diagnosis

Check of the board, earthing, protections, circuits and wet rooms. Written report with priorities.

Board and protections

Replacement of fuse boards, addition of 30 mA RCDs, correct breaker rating per circuit.

Earthing

Creation or repair of the earth electrode, equipotential bonding in bathroom and kitchen, resistance measurement.

Consuel certificate

File preparation, final check and issue of the compliance certificate required for any new connection.

Chablais, Genevois, Annecy area

Chablais, Genevois, Annecy area

We upgrade homes and premises across the Chablais, from Allinges to Evian-les-Bains via Thonon, Sciez, Bons-en-Chablais and Douvaine, as well as in Annemasse, Saint-Julien-en-Genevois, Cluses and Annecy. Co-ownerships and landlords managing several properties in Haute-Savoie regularly entrust us with grouped compliance work.

The diagnosis takes about an hour on site. The quote is sent within 48 hours.

Frequently asked questions about compliance

Is compliance mandatory to sell or rent?

An electrical diagnosis is mandatory for any sale or rental of a property whose installation is over fifteen years old. Work is not imposed on sale, but a landlord must provide a property whose installation presents no danger. We often step in after an unfavourable diagnosis.

What is the difference between safety work and full compliance?

Safety work corrects the six danger points set by regulation (earth, RCD, board, wet rooms, damaged conductors, obsolete equipment). Full compliance applies the whole NF C 15-100 standard, as for a new build. We advise the option suited to your budget and project.

When is a Consuel certificate needed?

For any new installation, any complete renovation and any new grid connection, including for an EV charger or solar production. We prepare and file the application for you.

How long does the work take?

A board replacement with earthing is done in one day. A full compliance upgrade of a home takes three days to two weeks depending on the floor area.

Everything we can do for you

Have an electrical project in mind?

Contact us for a free, no-obligation quote. Response within 24 hours.